This project is located on Upper Tangshen Road in Singapore, adjacent to the Seletar Expressway and directly across the street from Springleaf MRT Station, offering convenient transportation access. The project is invested in and developed by GuocoLand Pte. Ltd., with China Construction (South Pacific) Development Co., Ltd. serving as the general contractor and CHCI. responsible for the pile foundation construction. The project plans to construct five 25-story apartment buildings, totaling 909 residential units. Pile foundation work included the construction of rotary-drilled cast-in-place piles, ultimate bearing capacity tests, and pile foundation inspections. The project comprised a total of 413 engineering piles with diameters ranging from 600 to 1,600 mm and lengths from 5.8 to 41.6 m. Additionally, two ultimate test piles and 12 tower crane foundation piles were constructed concurrently.
The project team arrived on-site on February 3, 2025, to begin preparations; construction of the engineering piles officially commenced on May 8, 2025; and the project was successfully completed on December 21, 2025, with the entire project cycle lasting 228 days.
The engineering geological conditions at the project site were complex, with significant variations in the topography of the underlying granite bedrock. In some areas, slightly weathered rock exhibited high strength, making rock-embedded drilling particularly challenging. During construction, a staged drilling and coring process was adopted, supplemented by a new rock-breaking tool and a modified roller cone drill, which effectively improved hard rock drilling efficiency. By optimizing equipment layout and construction organization plans, the team achieved technological innovation while reducing costs and improving efficiency.
Safety and quality standards were strictly adhered to throughout the project, with no safety or quality incidents occurring during construction. Two limit test piles were loaded to 3.5 times the design load, and the pile bodies remained intact with no damage; testing of the remaining pile foundations proceeded in an orderly manner, including static load tests on 4 piles, PDA high-strain tests on 8 piles, and PIT low-strain tests on 34 piles, with all pile foundation test results meeting specifications.
This project actively applied high-efficiency hard rock drilling techniques, implemented noise control and green construction requirements, scientifically coordinated resource allocation, and continuously improved construction efficiency, thereby accumulating valuable practical experience for pile foundation construction in complex granite strata in the Singapore region.